NOTE: This is just a draft contract in which we have considered a model project to analyze the costs and terms of payment. Defects, leaks, narrowings or other defects that may occur within three calendar months from the date of completion of the work are corrected and corrected by the contractor at its own expense, on instruction from the architect or owner and within the reasonable time to specify. The owner should be able to monitor the work done by the owner and require modifications based on his needs. The contractor is required to supply the goods and products in accordance with the contract. There should be communication between the owner and the contractor so that the project is carried out without any problems. Planning plans should comply with local regulations and full information should be made available to the owner. Various elements such as building structure, electrical wiring, plumbing, drainage, septic tank, water tanks and gutters, access to the road, landscaping and full description should be included in the agreement, so there will be no ambiguity. An employment contract for the construction of the house in India between the owner and the contractor must be concluded to mention all civil engineering work included in the contractual agreement and excluded. In order for the liquidated damage to be maintained, the damage to the owner must be uncertain or difficult to determine in advance. In addition, the liquidated damage must be a reasonable amount and cannot be a penalty. And the delay in construction cannot be due to circumstances that are not controlled by the contractor, such as.B. changes in work or extreme weather.

This agreement allows the parties to write down the exact nature and details of the work to be carried out, as well as the responsibilities of each party throughout the construction. The terms of payment for the project are also mentioned. In general, there are three types of price agreements: RESOLUTION OF DISPUTES between the contractor and the owner, while the owners own land that #________ – (address of the land on which construction is under way) and a house on the land mentioned, in accordance with the approved architect`s plan and the specifications, tariffs and quantities contained in this contract. Cost or cost-plus: In a cost-plus contract, the owner reimburses the contractor for all costs incurred during construction, such as equipment and work. The owner also pays an agreed profit margin, usually a flat fee or a percentage of the total cost. Risk factors should be included in the contract to protect the interests of the owner. If you do not read the written agreement, you will not be in a defensive position. The supply of products and services is mentioned in the contract between the owner and the contractor.

The standard agreement between the owner and the contractor will contain full details of the construction. The construction must be carried out as a local construction. The contract should include drawings and specifications approved by the relevant authority. Details of the authorization granted by the local government should also be mentioned in the agreement. (c) Notwithstanding 12 (b), the architect may, with the prior written permission of the owner, authorize the maintenance of such defective materials and/or works with the owner`s consent and set the lower rates or prices which they deem correct and which are binding on the holder.

Tags are not defined
Comments are closed.